Well stimulation methods
📂 For Education Students
👤 al_ac
Product Description
Practical work number 1
"The choice of density of the fluid killing in the repair of wells"
The purpose of the lesson: To learn how to determine the necessary density of the killing fluid during well repair under given geological and technical conditions.
Task number 1: Calculate the required density of the fluid killing when repairing a well under given geological and technical conditions. The initial data for the calculation are presented in table 4.3.
Practical work No. 2
"Choosing a lifting unit for carrying out
repair work "
Purpose of the lesson: Learn how to choose a mobile lifting unit
Task No. 2: Select a mobile lifting unit using the data from task No. 1, as well as the source data for calculating table 4.3.
Practical work No. 3
"Determination of the length of the unattached part of the technological column"
Purpose of the lesson: To learn how to determine the length of an uncaught tubing string.
Task No. 3: In the well with rigging of the 4 × 5 tackle system, drill pipes were stuck. The weight of the drill pipe string in suspension before the grip according to the testimony of GIV-2, was equal to Q (table. 4.4) divisions. The obtained extension of the drill string was l (table. 4.4)
Determine the length of the not stuck part of the drill string. Use the initial data for the calculation from previous tasks, as well as table 4.4.
Table 4.4
The initial data for the calculation
Practical work No. 4
"Determination of the allowable tensile load on the fishing tool in the wells"
The purpose of the lesson: To learn to determine the permissible tensile loads on the fishing tool, as well as the necessary effort when walking the tubing. "
Task: Determine the maximum allowable load on the tube during fishing operations, the allowable tension force when pacing a stuck drill pipe string with a diameter of 89 mm. The initial data for the calculation are presented in table 4.6.
Table 4.6
The initial data for the calculation
"The choice of density of the fluid killing in the repair of wells"
The purpose of the lesson: To learn how to determine the necessary density of the killing fluid during well repair under given geological and technical conditions.
Task number 1: Calculate the required density of the fluid killing when repairing a well under given geological and technical conditions. The initial data for the calculation are presented in table 4.3.
Practical work No. 2
"Choosing a lifting unit for carrying out
repair work "
Purpose of the lesson: Learn how to choose a mobile lifting unit
Task No. 2: Select a mobile lifting unit using the data from task No. 1, as well as the source data for calculating table 4.3.
Practical work No. 3
"Determination of the length of the unattached part of the technological column"
Purpose of the lesson: To learn how to determine the length of an uncaught tubing string.
Task No. 3: In the well with rigging of the 4 × 5 tackle system, drill pipes were stuck. The weight of the drill pipe string in suspension before the grip according to the testimony of GIV-2, was equal to Q (table. 4.4) divisions. The obtained extension of the drill string was l (table. 4.4)
Determine the length of the not stuck part of the drill string. Use the initial data for the calculation from previous tasks, as well as table 4.4.
Table 4.4
The initial data for the calculation
Practical work No. 4
"Determination of the allowable tensile load on the fishing tool in the wells"
The purpose of the lesson: To learn to determine the permissible tensile loads on the fishing tool, as well as the necessary effort when walking the tubing. "
Task: Determine the maximum allowable load on the tube during fishing operations, the allowable tension force when pacing a stuck drill pipe string with a diameter of 89 mm. The initial data for the calculation are presented in table 4.6.
Table 4.6
The initial data for the calculation
Additional Information
4 practical work Option I do not remember . but indicators - RPL, MPa 28 N, m 2810 P 0.05
Compare -, because the work is not returned!
Compare -, because the work is not returned!
Related Products
Solution of the C2 Option 04 Dievskaya VA Malyshev IA
Seller: TerMaster
Solution of the C2 Option 05 Dievskaya VA Malyshev IA
Seller: TerMaster
Dievsky V.A. - Solution of task C2 variant 22 (C2-22)
Seller: Михаил_Перович
Solution K5 B04 termehu of Reshebnik Yablonsky AA 1978
Seller: TerMaster
Solution of the K2 version 07 Dievskaya VA Malyshev IA
Seller: TerMaster
Solution of the C2 Option 14 Dievskaya VA Malyshev IA
Seller: TerMaster
Solution of the C2 Option 08 Dievskaya VA Malyshev IA
Seller: TerMaster
Conflict law test Synergy answers 90/100 points
Seller: sinergey