Tasks personnel audit option 2
📂 For Education Students
👤 ИФЦ Студия
Product Description
To determine the effectiveness of interventions to reduce the loss of working time associated with the production and incidence of industrial injuries.
To reduce the loss of working time due to absence from work due to occupational disease at the plant were improved working conditions. Namely were repaired interior, installed ventilation and air conditioning.
Assess changes in productivity occurring in the organization over the past period from the data presented in the table.
To reduce the loss of working time due to absence from work due to occupational disease at the plant were improved working conditions. Namely were repaired interior, installed ventilation and air conditioning.
Assess changes in productivity occurring in the organization over the past period from the data presented in the table.
Additional Information
The uniqueness of solutions - 51%
Related Products
Solution of the C2 Option 04 Dievskaya VA Malyshev IA
Seller: TerMaster
Solution of the C2 Option 05 Dievskaya VA Malyshev IA
Seller: TerMaster
Dievsky V.A. - Solution of task C2 variant 22 (C2-22)
Seller: Михаил_Перович
Solution K5 B04 termehu of Reshebnik Yablonsky AA 1978
Seller: TerMaster
Solution of the K2 version 07 Dievskaya VA Malyshev IA
Seller: TerMaster
Solution of the C2 Option 14 Dievskaya VA Malyshev IA
Seller: TerMaster
Solution of the C2 Option 08 Dievskaya VA Malyshev IA
Seller: TerMaster
Conflict law test Synergy answers 90/100 points
Seller: sinergey